MEMBRANES AND MATERIALS FOR ENVIRONMENTAL SEPARATIONS – Funding

List of previous projects (indicative)

  1. FP7-PEOPLE-2013-ITN (607040):   Novel Complex Metal Hydrides for Efficient and Compact Storage of Renewable Energy as Hydrogen and Electricity  – ECOSTORE, 01/011/2013-31/10/2017. Total Budget: 4,051,541.94 €, NCSRD budget: 235,792.24 €.
  2. FP7-PEOPLE-2012-IAPP (324410): New weather-stable low gloss powder coatings based on bifunctional acrylic solid resins and nanoadditives – GLOW, 01/11/2013-31/10/2017. Total Budget: 2,520,913.37 €, NCSRD budget: 715,819.06 €.
  3. FP7-ENERGY-2011-1 (283077): Novel IΟnic LΙquid and supported ionic liquid solvents for reversible CAPture of CO2 –IoLiCAP, 01/12/2012-30/11/2014, Total Budget 5,770,719.00 €, NCSR Demokritos budget: 1,048,161.00 €
  4. (FP7-NMP-2011-SMALL-5 (280890): Development of NEXT GENeration cost efficient automotive CATalysts- NEXT-GEN-CAT), 01/02/2012-31/01/2016. Total Budget 5,615,292.40€, NCSR Demokritos budget: 777,428.00 €
  5. FP7-PEOPLE-2009-IAPP (251562): ATLAS-H2 – Advanced Metal Hydride Tanks for Integrated Hydrogen Applications, 2010-2014. Total Budget: 2,268,340 €, NCSR Demokritos budget: 526,039 €.
  6. ESPA-GSRT, NOVEL Technologies ON the implementation of CCS. Total Budget 683,165.00 €, NCSR Demokritos Budget: 124,300.00 €
  7. FP7-NMP-2008-4.0-2, Innovative catalytic technologies & materials for next gas to liquid processes (NEXT-GTL), 01/11/2009-31/10/2013, Total Budget: 12,570,000 €, NCSR Demokritos Budget 480,000 €.
  8. FP7-INFRASTRUCTURES 2011-1 (284522), “H2FC-European Infrastructure (Integrating European Infrastructure to support science and development of Hydrogen- and Fuel Cell Technologies towards European Strategy for Sustainable, Competitive and Secure Energy)” 01/11/2011-31/10/2015, Project Budget: 10,147,583 €, NCSR“D” Budget 371,195 €.
  9. FP7-PEOPLE-2011-IAPP (286413): “High-throughput development of carbon-polymer nanocomposites for marine applications – CARBONCOMP, 01/09/2011-31/08/2015. Total Budget: 1,537,194 €, NCSRD budget: 388,211 €.
  10. FP7/FCH-JU-2011-1(303428): BOR4STORE – Fast, reliable and cost effective boron hydride based high capacity solid state hydrogen storage materials, 2012-2015. Total Budget: 4,070,711 €, NCSR Demokritos budget: 513,594 €.
  11. MPNS COST Action MP1103: – Nanostructured Materials for Solid-State Hydrogen Storage, 25/10/2011-24/10/2015.
  12. CSA, ENV-NCP-Together-21249, “Environment NCPs cooperating to improve their effectiveness”, 2008-2013, Budget: 2,997,000.00€, NCSR”D” budget: 73,345€.
  13. ESPA 2007-2013, THALIS-Univerisity of Ioannina (80790). “Development of Functional Micro- & Mesoporous Hybrid Materials for Technology & Environmental Applications – POROTECH, 2012-2015. Total Budget: 600,000 €, NCSR Demokritos budget: 105,000 €.
  14. ESPA 2007-2013, THALIS-University of Crete (3580): Design of novel nanoporous materials for hydrogen storage-HYDROSTORE, 2012-2015. Total Budget: 512,820 €, NCSR Demokritos budget: 147,000 €.
  15. ESPA GREECE – CHINA bilateral cooperation 2012-2014 12CHN248. CArbonDioxide CApture using a novel hybrid MEmbrane/Sorption System – CAMES. Total budget :450,000 € NCSR Demokritos budget :200,000 €
  16. ESPA GREECE – CHINA bilateral cooperation 2012-2014 12CHN290. Development of Ionic Liquid based selective adsorbents and membranes for the flue gas and carbon dioxide PURification with novel hybrid adsorbent-mEmbrane process – IOLIPURE. Total budget: 424,000€ NCSR Demokritos budget: 225,000 €.
  17. ESPA, Cooperation 2011 (1912) “Helium Recovery, towards the creation of a National Helium Reserve”, NCSRD budget: 122.000 €.